Veracruz Aquarium, Mexico

Veracruz Aquarium, Mexico

Galvanized Rebar was used extensively in the construction of the Veracruz Aquarium including its three main exhibit areas: Fresh Water Galleria, Oceanic Tank and Salt Water Galleria.  Construction was completed in late 1992 and the Aquarium opened on November 13th,...
Rome Mosque

Rome Mosque

The mosque was dedicated in 1995.  Galvanized reinforcement was used extensively in the dome of the mosque and in the external...
National Theatre, London

National Theatre, London

This important public building, located on the Thames adjacent to Waterloo Bridge, was constructed using 1000 t of galvanized reinforcement in external parapet walls to ensure that these most exposed parts of the building were free from spalling and...
Parliament House, Canberra

Parliament House, Canberra

Designed for a 200 year life, Australia’s New Parliament House was opened in January, 1988 to coincide with the bicentenary of European settlement. This important public building required the use of sound durable concrete free from the risk of cracking and spalling....
Lotus Temple

Lotus Temple

The Baha’i or ‘Lotus’ Temple at Qutub Minar near Delhi, was completed in 1986. Its shape is based on the petals of the lotus flower with 27 interior petals surrounded by 9 open petals and 9 broad entrance petals. This monumental structure, using bright...